Pouring concrete is a time-sensitive step that requires a highly coordinated crew. The wet mix must be deposited evenly to avoid air pockets and segregation (separation of water and gravel). In NYC, the concrete must meet a minimum compressive strength of 3,000 to 4,000 PSI, and it must be placed continuously to avoid weak points known as "cold joints".
← Back to Full Glossary