Concrete strike-off

Repair, Replacement & Construction Methods
Carlos Mendez, Lead Concrete Specialist
Reviewed by Carlos Mendez Lead Concrete Specialist
Concrete strike-off The initial step in finishing a pour, where a straight-edged tool is dragged across the top of the formwork to cut off excess wet concrete.

Strike-off, also known as screeding, establishes the initial flat surface of the sidewalk. By resting the strike-off board on top of the side forms, workers ensure the concrete is flush with the desired grade. This step is critical because it ensures there are no low spots that will collect water or high spots that could become trip hazards later.

Strike-off sets the surface your sidewalk will keep

Cut to grade off the forms, so there are no low spots holding water later.

Get a Free Estimate

Frequently Asked Questions About Concrete strike-off

What is strike-off?
The first finishing step, where a straight edge is dragged across the top of the forms to cut off excess wet concrete and establish the surface level.
How does strike-off set the grade?
By riding on top of the side forms, so the concrete surface follows exactly the line and pitch the forms were set to.
Why does this step matter?
It eliminates low spots that would collect water and high spots that could become trip hazards after curing.
Is strike-off the same as screeding?
Yes, the terms are used interchangeably for this step.