Scope of work Scope of work is the written description of what a contractor will do on a project.
It should state the specific tasks, materials, limits, and exclusions so the owner knows exactly what is included. For NYC sidewalk jobs, a clear scope helps avoid disputes over demolition, replacement, cleanup, permits, and finishing details.
Know exactly what is and is not included
Flags, thickness, base, permits, disposal, restoration and inspection, all defined in writing.
The written description of exactly what the contractor will do, including tasks, materials, limits and exclusions.
What should a sidewalk scope specify?
Which flags are involved, demolition and disposal, base preparation, slab thickness, reinforcement if any, finish, jointing, permits, restoration and the inspection step.
Why do exclusions matter?
Because unstated items become disputes. Backfill, landscaping restoration, hardware adjustment and permit fees are common gaps.
How does scope relate to the violation?
It should match the flags on the Preliminary Inspection Report, so the work performed is what DOT will re-inspect.
Related Glossary Terms
Written estimate
– A written estimate is a documented price proposal that lists the expected cost and basic terms of th...
Change order
– A change order is a written update to the original agreement that adds, removes, or changes work or...
Quality control
– Quality control is the process of checking that work meets the required standard.